Installation, Errection, Testing and commissioning Works for Al Suwair 132/33 kV GIS Substation

Installation, Errection, Testing & Commissioning for substation Equipment As below: 132/33 kV Power Transformers (3 sets of 63 MVA)

Installation, Errection, Testing & Commissioning for substation Equipment As below: 132/33 kV Power Transformers (3 sets of 63 MVA)

ALL outdoor equipment (CT, VT, SA, ES, Aux Transformers and Capacitor banks…etc.)

145 kV GIS Type Switchgear, completed for all assembly with CB, CT, VT, SA, DS, BC and Bus Duct

HV, MV and LV cable pulling and termination. 33 kV /31.5 KA GIS type Switchgear

ALL indoor panels & Communication equipment (Control, protection, metering, PLC, SCADA, PABX)

Other Systems (Earthing, Lightning, CCTV)

 

Project Details:

Client: HYOSUNG CORPORATION

End User:MOE-General Directorate of Electrical Transmission Projects

Year: 2016 – 2017

location: AL Samawah-Iraq