Bismayah POWER PLANT/ CCTV System

Installation, Testing and Commissioning Works for a complete CCTV system at Bismayah power Plant Stage 1 & Stage 2 with ABB
BISMAYA NEW CITY PROJECT/ HV TESTING

Testing and Commissioning Services at BISMAYA NEW CITY PROJECT including power frequency withstand test for 132kv GIS switchgear and AC HI-POT test for 33kv switchgear
AL KHAIRAT POWER PLANT TESTING PROJECT

Hiring the HV Testing Equipment (up to 600kV) and Performing the Required HV and Partial Discharge Tests in AL KHAIRAT Power Plant – GE GIS 400/132 kV Substation.
Installation, Errection, Testing and commissioning Works for Al Suwair 132/33 kV GIS Substation

Installation, Errection, Testing & Commissioning for substation Equipment As below: 132/33 kV Power Transformers (3 sets of 63 MVA)
Al Nasriya North 132 kV GIS Replacement Project

Dismantling and removal of old 132kV GIS, Minor Civil works modifications for Installation of the new GIS
SF6 Gas Leakage inspection and Repair works in Najybia 400/132kV GIS Substation

Inspection of the SF6 Gas leakage in ABB 400kV GIS switchgear Inspection of the SF6 Gas leakage in ABB 132kV GIS switchgear
Al Amara 400 kV Substation, Switchgear Room Project – 2014

Rehabilitation of 11 kV Switchgear room (Civil and electromechanical works) Supply of 2 sets of 11kV Switchgear panels
EPC 400 kV New Ammara Substation Project- 2008

Turnkey project to build the 400/ 132 / 11 KV, 2*250 MVA Amara Substation which includes:
Install Seven 33/11 kV ,2*31.5 MVA Substations Project

Civil works: Cleaning and site preparation, back filling, building, roads, foundations of transformers and steel structure and all other activities of civil work.
Al Mosul 400kV GIS Substation Project

One 400 KV GIS diameter. Three single phase Autotransformers. One new three phase 400 KV reactor. One new 11 KV reactor (Air insulated type).