Rehabilitation works for 400kV Al-Hartha line bay, in Al-Qurna 400kV Substation.
Rehabilitation works for the bus-duct related to the 400kV Al-Hartha line bay, at Qurna 400 Substation, in addition to the
Rehabilitation works for the bus-duct related to the 400kV Al-Hartha line bay, at Qurna 400 Substation, in addition to the
installation of (6 no.) of outdoor terminations (Prysmian type) and (6 no.) of indoor termination (Pfisterer type). in addition to
The Installation, Testing & Commissioning Works for 132 & 33kV GIS and HV Cables in addition to Power Transformer oil
Our Scope includes Construction works including Civil, Installation, and Testing & Commissioning Works for Establishment of Al Hussainiya 132kV Substation.
Engineering consultation, design, Supply, Install, Test. commission, and energize the new 132kV GIS system equipment including the consultation for the
Our scope includes the completion of all the ETC works & HV testing for 6 (Six) numbers of 132/33kV Substations
Installation, Testing and Commissioning Works for a complete CCTV system at Bismayah power Plant Stage 1 & Stage 2 with ABB
High Voltage and Partial Discharge Tests for GIS 400/132/11KV BAGHDAD WEST NORTH Substation with GE
Installation & Commissioning of HV Accessories (132kv Sealing Ends) for BAGHDAD WEST NORTH Substation with NKT