The scope of works included 132kV Cables pulling, completing the termination works for the same, in addition to conducting the HV testing works for the cables and terminations using our HV testing kits. and as per below details:
– 132kV Cables pulling
– CSE termination works for 12 Pcs of 132kV cable termination from Prysmian
– High Voltage testing for the HV cables & 132kV GIS SWG
Project Details:
Client : Al-Bilal Company
End User : Basra Gas Company (BGC).
Year: December 2023-Febreuary 2024
Location: Basra – Iraq