HV Cables pulling , Testing and Cables termination works for NCS2 with Al-Bilal Company at BGC.

IMG_0826

The scope of works included 132kV Cables pulling, completing the termination works for the same, in addition to conducting the HV testing works for the cables and terminations using our HV testing kits. and as per below details:

– 132kV Cables pulling

– CSE termination works for 12 Pcs of 132kV cable termination from Prysmian

– High Voltage testing for the HV cables & 132kV GIS SWG

 

Project Details:

Client : Al-Bilal Company

End User : Basra Gas Company (BGC).

Year: December 2023-Febreuary 2024