Skip to content
qascco logo color
  • Home
  • About Us
  • Services
    • Construction, Installation, Testing & Commissioning Works
    • Engineering and Consultation Services
    • HV Cables and Terminations Works
    • High Voltage Testing for GIS & Cables up to 400kV
    • Procurement and Logistics Services
  • Projects
  • Profile
  • News
  • Contact Us
  • Home
  • About Us
  • Services
    • Construction, Installation, Testing & Commissioning Works
    • Engineering and Consultation Services
    • HV Cables and Terminations Works
    • High Voltage Testing for GIS & Cables up to 400kV
    • Procurement and Logistics Services
  • Projects
  • Profile
  • News
  • Contact Us

Tag: Completed

Construction, Installation, and Related Services for the 132/33 kV GIS Imam Sadek Grid Substation (TPIF Unit 3.2)

            132/33 kV GIS Imam Sadek Grid Substation Project located within GGIP-Ratawi Solar TPIF project.With MITAS Energy and Metal Construction Inc. This project marks animportant milestone, as we begin the construction phase for a criticalinfrastructure asset that will support reliable power distribution andoperational continuity in the field.   Scope of […]

Rehabilitation works for 400kV Al-Hartha line bay, in Al-Qurna 400kV Substation.

Rehabilitation works for the bus-duct related to the 400kV Al-Hartha line bay, at Qurna 400 Substation, in addition to the replacement works for the damaged equipment, and the required commissioning works for the bay.

HV Cables pulling , Testing and Cables termination works for NCS2 with Al-Bilal Company at BGC.

132kV Cables pulling, testing and termination works. The works were done at NCS2 site for BGC,

Basrah refinery upgrading project/132kV Outdoor “Cables Sealing End”installation works

Installation works for 132kV outdoor “Cable sealing end” with JGC Corperation.

132kV Cable Termination works for Basrah NGL Project at BGC NGL Facilities Artawi , Iraq

Installation works for 36 no. of HV 132 kV cable terminations, using prysmian termination kits in addition to the HV testing works.

132 kV Cable Sealing Ends Installation Works for Cables Feeding Power Transformers at SST Substation

installation of (6 no.) of outdoor terminations (Prysmian type) and (6 no.) of indoor termination (Pfisterer type). in addition to the HV testing works for the installed cables and terminations.

West Qurna S2 / 132KV & 33KV GIS AND HV CABLE INSTALLATION

The Installation, Testing & Commissioning Works for 132 & 33kV GIS and HV Cables in addition to Power Transformer oil filling and treatment.

Rehabilitation and replacement of 132 kV GIS for al-Bakir Substation

Engineering consultation, design, Supply, Install, Test. commission, and energize the new 132kV GIS system equipment including the consultation for the design of the new civil works to suit the rehabilitation works.

132/33kV Substation Project (13 Nos.) Spare HV Transformers under Siemens / German Loan Roadmap Phase

Our scope includes the completion of all the ETC works & HV testing for 6 (Six) numbers of 132/33kV Substations in this project.

qascco logo white

Qimmat Al Sadara Al Iraqia Trading and General Contracting Company Ltd, Part of Jurmat Group, Directly involved in the EPC projects/ Construction, Rehabilitation, Installation, Testing & Commissioning  and supply works for Electrical Substations up to 400 kV, and power plants.

Facebook Linkedin Youtube

Navigation

  • Home
  • About Us
  • Services
  • Projects
  • News
  • Contact Us

©2024 QASCCO, All Rights Reserved, Powered by ONLINERELOADED