Our scope included the following:
- Disassemble the old GIS
- Engineering consultation, design, Supply, Install, Test. commission, and energize the new 132kV GIS system equipment including the consultation for the design of the new civil works to suit the rehabilitation works.
As the main challenge in this project was to integrate the two systems (Old and new), where we have cooperated with our partners (supplier) to configure the new design for the GIS to suit the existing system.
Project Details:
Client & end user: Ministry of Electricity, General Company for Electrical energy Transmission –South Region-Iraq
location: Basra – Iraq
2019 – 2022