BAGHDAD WEST NORTH GIS 400/132/11KV Substation

Installation & Commissioning of HV Accessories (132kv Sealing Ends) for BAGHDAD WEST NORTH Substation with NKT

Installation & Commissioning of HV Accessories (132kv Sealing Ends) for BAGHDAD WEST NORTH Substation with NKT, including:

  • Installation of outdoor termination type FEV 145-P, V1 including single phase link boxes and sheath testing after installation (120 PCs).
  • Installation of male part of GIS- termination type XEV 145-S4 including three phase link boxes and sheath testing after installation (120 PCs).
  • Supervision of Cable Pulling and Sheath Testing after cable laying.

Project Details:

Client: GE/NKT

End User: MOE, Iraq

Yar: 2018

location: Baghdad-Iraq