Installation & Commissioning of HV Accessories (132kv Sealing Ends) for BAGHDAD WEST NORTH Substation with NKT, including:
- Installation of outdoor termination type FEV 145-P, V1 including single phase link boxes and sheath testing after installation (120 PCs).
- Installation of male part of GIS- termination type XEV 145-S4 including three phase link boxes and sheath testing after installation (120 PCs).
- Supervision of Cable Pulling and Sheath Testing after cable laying.
Project Details:
Client: GE/NKT
End User: MOE, Iraq
Yar: 2018
location: Baghdad-Iraq