Installation, Errection, Testing and commissioning Works for Al Suwair 132/33 kV GIS Substation
Installation, Errection, Testing & Commissioning for substation Equipment As below: 132/33 kV Power Transformers (3 sets of 63 MVA)
Al Nasriya North 132 kV GIS Replacement Project
Dismantling and removal of old 132kV GIS, Minor Civil works modifications for Installation of the new GIS
Besmaya 400/132 kV substation Temporary stage Works Commissioning project
Provide Testing Engineers along with the below testing kits to carry out the commissioning works for Besmaya temporary stage.
SF6 Gas Leakage inspection and Repair works in Najybia 400/132kV GIS Substation
Inspection of the SF6 Gas leakage in ABB 400kV GIS switchgear Inspection of the SF6 Gas leakage in ABB 132kV GIS switchgear
Al Amara 400 kV Substation, Switchgear Room Project – 2014
Rehabilitation of 11 kV Switchgear room (Civil and electromechanical works) Supply of 2 sets of 11kV Switchgear panels
Ammara Project _ 400/132/11 KV Substation Extension
Complete Electro-Mechanical Installation works of the following main activities: 6 Diameters and 2 B. Ss 400kV complete with all accessories.
2 sets of 3 single phase autotransformer 400/132/11 kV, 250MVA complete with all accessories.
EPC 400 kV New Ammara Substation Project- 2008
Turnkey project to build the 400/ 132 / 11 KV, 2*250 MVA Amara Substation which includes:
Install Seven 33/11 kV ,2*31.5 MVA Substations Project
Civil works: Cleaning and site preparation, back filling, building, roads, foundations of transformers and steel structure and all other activities of civil work.
Al Mosul 400kV GIS Substation Project
One 400 KV GIS diameter. Three single phase Autotransformers. One new three phase 400 KV reactor. One new 11 KV reactor (Air insulated type).